Paul Wright Natatorium

The pool -- at 7,723 feet, the highest collegiate pool in the country -- underwent a postseason overhaul in Spring 2022 with a new Diamond Brite plaster and tile pool finish installed, along with new pool lighting and new 6-inch Wave Eater lane lines. Mad Jack also makes his first appearance in the pool, added in tiles on the downslope of the pool bottom.

The six-lane, 25-yard facility includes:

  • competition starting blocks with track-start fins and backstroke-start wedges
  • an overflow run-off gutter system
  • 2 analog timing clocks and 2 Colorado Timing System digital clocks
  • Colorado Timing System pads and overhead 6-lane display
  • a 1-meter, single-rail Duraflex springboard
  • a visiting team locker room and a renovated Mountaineer locker room